Formosa Chemicals and Fibre Corporation — Digital & Energy Transition Group · Aug 2023 – Present

Supported the build-out of an SiC pilot fab at FCFC's Digital & Energy Transition Group, including COMSOL multiphysics thermal-field analysis for high-temperature processing.

TODO: floor area / tool count / capex / timeline / TODO: team size

🌐 改用繁體中文閱讀
COMSOL MultiphysicsThermal SimulationSiC High-Temperature MaterialsFab Build-outProject ManagementEnvironmental ComplianceProcurement & Budget

📝 Summary

Few semiconductor manufacturing problems are purely technical. For an SiC pilot fab to run, technology, procurement, environmental compliance, safety and training all have to land together — and there is only one shot at getting it right.

🎯 Problem

SiC is the key material for third-generation semiconductors, but its high-temperature process thermal control, tool selection, facility layout and regulatory paperwork bear little resemblance to a conventional line. This pilot fab was not an extension of an existing plant — it was a from-scratch build with no SOP to reuse.

🛠️ Approach

  • Technical: participated in planning the SiC pilot fab and ran COMSOL multiphysics thermal-field simulations to support process-condition evaluation
  • Administrative: annual budgeting, expense control (licensing fees), material requisition and incoming inspection
  • Regulatory: water permits, waste-clearance amendments, factory registration filings; environmental operations and outsourcing management; investment tax-credit support
  • Organisational: staffing, work-standard authoring, training (including outsourced), IT security and device management, factory access control

📈 Impact

  • Supported the commissioning of an SiC high-temperature materials trial line, building hands-on third-generation semiconductor manufacturing experience
  • Developed the ability to integrate technical and administrative workstreams in a project with no precedent to follow
  • TODO: floor area / tool count / capex / team size